Records, including documents, photos, emails, videos or other records, showing the location of any and all Soil Nails installed or to be installed in connection with Section 1 of Westside Extension Purple Line, Contract C1045.


Received

June 25, 2020 via web


Departments

Public Records Requests

Documents

Public

(loading...)

Staff

Point of Contact

Williams

Request Closed   Hide Public

We have released all of the records that meet your request in accordance with the California Public Records Act.

Metro's NextRequest (Public Records Tracking System) is maintained in compliance with Metro's records retention policy and records schedule. Requests and attachments will be removed from this system according to Metro’s records retention schedule.  This is to maintain the consistency and integrity of the records management program, as well as the utility of this system.

 If applicable, please note:

  • Email messages/mailbox files will be deleted 1 Month after request closure.
  • Videos are not hosted here. DVDs not retrieved by requestors will be destroyed 2 years after request closure.
  • The records requests themselves and any attachments will be deleted 3 Years after request closure.

If records are made available, please make sure you access/download/pick-up the records as soon as possible.  System records will be removed automatically at their expiration periods. Use of this system is not intended to extend or reduce Metro's adopted retention schedule time periods.

You may contact me at williamsch@metro.net if you have any questions related to this public records request.

Sincerely,

Charlene Williams
RIM Analyst
Records and Information Management

June 30, 2020, 8:09am
Request Published Public
June 30, 2020, 8:09am
Document(s) Released to Requester   Details Public
C1045 190515 1115am, STS installed sleeves for soil nails and pipe canopy before shotcrete at La Cienega tunnel eye, looking SW.jpg
C1045 190515 930am, STS surveyor layout markss for pipe canopy and soil nails at La Cienega tunnel eye, looking S.jpg
C1045 190517 1110am, Moretrench prepared rebar for tunnel eye soil nails at La Cienega, looking NE.jpg
C1045 190530 1146am, STS, Conditions in La Cienega Shaft, Looking SE.jpg
C1045 190530 825am, Moretrench craned material for tunnel eye soil nails into La Cienega shaft, looking N.jpg
C1045 190531 850am, Moretrench drilled on test soil nail of west tunnel eye result in huge amount of waste water at La Cienega, looking SW.jpg
C1045 190531 855am, Moretrench drilled on test soil nail of west tunnel eye result in huge amount of waste water at La Cienega, looking SW.MOV
C1045 190613 1156am, STS, Cementitious-appearing residue at DSW-16, S of La Cienega shaft, Looking SE.jpg
C1045 190613 1156am, STS, Cementitious-appearing residue at DSW-16, S of La Cienega shaft, Looking W.jpg
C1045 190529 845am, Moretrench prepared rebar for tunnel eye soil nails at La Cienega shaft, looking W.jpg
C1045 190530 1125am, STS, Continued flow through drain pipe, sleeve & shotcrete face, Pile P-155 to P-156, La Cienega West Wall, looking W.jpg
C1045 190620 1038am, STS, Baker tank prior to Moretrench drilling soil nail, Gale Shaft, looking NW.jpg
C1045 190620 1041am, STS, Baker tank prior to Moretrench drilling soil nail, Gale Shaft, looking NW.jpg
C1045 190626 1028am, STS, typical flow to SDW-9 without drilling, La Cienega Shaft, Looking SW.jpg
C1045 190627 1102am, Moretrench, Soil Nail Drilling at S Tunnel, Row 1, Nail 1, with runoff, W La Cienega Bulkhead, Looking S.jpg
C1045 190629 1053am, Moretrench drilling Soil Nail, N Tunnel, 3rd row, 3rd nail, with heavy runoff, W La Cienega Bulkhead, Looking SW.jpg
C1045 190629 1054am, Moretrench drilling soil Nail, N Tunnel, 3rd row, 3rd nail, with heavy runoff, W La Cienega Bulkhead, Looking SW.jpg
C1045 190711 1115am, Moretrench installed 2 inches PVC pipe on vacuum well #9 at La Cienega, looking SW.jpg
C1045 190626 1027am, STS, typical flow to SDW-8 without drilling, La Cienega Shaft, Looking W.jpg
C1045 190626 1117am, Moretrench Drilling Soil Nail #9 (2nd Row, 6th Nail), S tunnel, W bulkhead, La Cienega, Looking SW.jpg
C1045 190627 1059am, STS, Collector trench from Moretrench Grout plant during washout, La Cienega Shaft, looking N.jpg
C1045 190627 1113am, Moretrench, Grouting Soil Nail Drilling at S Tunnel, Row 1, Nail 1, with runoff, W La Cienega Bulkhead, Looking SW.jpg
C1045 190629 1048am, Moretrench drilling N Tunnel, third row, third nail, with heavy runoff, W La Cienega Bulkhead, Looking W.jpg
C1045 190629 1048am, STS, High flow of waste water from Moretrench drilling operation, La Cienega Shaft, Looking NW.jpg
C1045 190629 1049am, STS, High flow of waste water from Moretrench drilling operation, at SDW-8, STS Maintining SDW-8, Looking E.jpg
C1045 190613 1157am, STS, Cementitious-appearing residue & coring waste, SW corner of La Cienega Station, Level D, Looking SW.jpg
C1045 190613 1157am, STS, Cementitious-appearing residue & evidence of high flows, SW of DSW-16, S of La Cienega shaft, Looking SW.jpg
C1045 190613 1157am, STS, Cementitious-appearing residue at DSW-16, S of La Cienega shaft, Looking SE.jpg
C1045 190613 1157am, STS, Cementitious-appearing residue W of DSW-16, S of La Cienega shaft, Looking SE.jpg
C1045 190620 1105am, STS, SDW-8 Prior to Moretrench drilling Soil Nail, La Cienega Shaft, Looking NE.jpg
C1045 190620 1116am, Moretrench for STS, Setting up to drill Test Soil Nail #1, W bulkhead, S of La Cienega shaft, Looking NW.jpg
C1045 190620 1205pm, Moretrench for STS, drilling Soil Nail (Test Nail #1), West Bulkhead, Looking NW.jpg
C1045 190620 1206pm, Moretrench for STS, drilling Soil Nail (Test Nail #1), West Bulkhead, Looking S.jpg
C1045 190620 1211pm, STS, Baker tank during Moretrench drilling soil nail, Gale Shaft, looking NW.jpg
C1045 190620 1212pm, STS, Baker tank during Moretrench drilling soil nail, Gale Shaft, looking NW.jpg
C1045 190621 1128pm, Moretrench removing drill casing, La Cienega West bulkhead, Looking SE.jpg
C1045 190624 1102am, Moretrench Assembling Soil Nails for W Bulkhead, La Cienega Shaft, Looking W.jpg
C1045 190624 1111am, Moretrench preparing to Pull test Soil Nails at West Bulkhead, La Cienega, Looking W.jpg
C1045 190625 1022am, Moretrench staging Soil Nails for installation, La Cienega Shaft, looking N.jpg
C1045 190625 1026am, Moretrench installed Soil Nail, S Tunnel, 3rd row, 1st nail, at La Cienega W Bulkhead, Looking SW.jpg
C1045 190626 1023am, Moretrench, Drilling Soil Nail #17 (3rd Row, 7th Nail), S tunnel, W bulkhead, La Cienega, Looking NW.jpg
C1045 190626 1026am, STS, typical flow from Moretrench work area without drilling, La Cienega Shaft, Looking NW.jpg
C1045 190626 1031am, Moretrench, Installing Soil Nail #17 (3rd Row, 7th Nail), S tunnel, W bulkhead, La Cienega, Looking SW.jpg
C1045 190626 1032am, Moretrench, Grouting Soil Nail #17 (3rd Row, 7th Nail), S tunnel, W bulkhead, La Cienega, Looking SW.jpg
C1045 190626 1044am, STS, Flow from Moretrench work after grout plant washout, La Cienega Shaft, Looking NW.jpg
C1045 190626 1054am, Moretrench, Setting up to drill Soil Nail #9 (2nd Row, 6th Nail), S tunnel, W bulkhead, La Cienega, Looking SW.jpg
C1045 190626 1056am, STS QC & Moretrench, checking angle, Soil Nail #9 (2nd Row, 6th Nail), S tunnel, W bulkhead, La Cienega, Looking NW.jpg
C1045 190626 1057am, Moretrench Drilling Soil Nail #9 (2nd Row, 6th Nail), S tunnel, W bulkhead, La Cienega, Looking NW.jpg
C1045 190626 1058am, STS, Flow to SDW-9 during drilling, La Cienega Shaft, Looking SW.jpg
C1045 190626 1100am, STS, Flow to SDW-8 during drilling, La Cienega Shaft, Looking N.jpg
C1045 190626 1124am, STS, Baker tank not overflowing with no soil nail drilling, Gale Shaft, Looking W.jpg
C1045 190627 1050am, Moretrench, Soil Nail Drilling at S Tunnel, Row 1, Nail 1, with runoff, W La Cienega Bulkhead, Looking SW.jpg
C1045 190627 1052am, STS, Moretrench Soil Nail Drilling runoff at SDW-8, La Cienega Shaft, looking W.jpg
C1045 190627 1053am, STS, Collector trench from Moretrench Grout plant prior to washout, La Cienega Shaft, looking N.jpg
C1045 190627 1054am, STS, Collector trench at Moretrench Grout plant prior to washout, La Cienega Shaft, looking N.jpg
C1045 190627 1055am, STS, Moretrench Grout plant during washout, La Cienega Shaft, looking N.jpg
C1045 190627 1059am, STS, Collector trench at Moretrench Grout plant during washout, La Cienega Shaft, looking NW.jpg
C1045 190627 1059am, STS, Collector trench during Drilling & Grout Plant washout, W La Cienega bulkhead, looking N.jpg
C1045 190627 1102am, STS, Collector trench during Drilling & Grout Plant washout, W La Cienega bulkhead, looking N.jpg
C1045 190627 1104am, Moretrench, Installing Soil Nail at S Tunnel, Row 1, Nail 1, W La Cienega Bulkhead, Looking SW.jpg
C1045 190627 1121am, Moretrench, Re-Grouting Soil Nail Drilling at S Tunnel, Row 1, Nail 3, with runoff, W La Cienega Bulkhead, Looking SW.jpg
C1045 190627 327pm La Cienega Station level D. Moretrench placing grout at soil nail #6 row 2 west wall C piles 152-153. Looking West..jpg
C1045 190627 400pm La Cienega Station level D. Moretrench drilling soil nail 16 row 2 piles 155-154 W. wall C. Looking West..jpg
C1045 190628 1115am, STS, Moretrench drilling runoff through grout plant area, La Cienega shaft, looking NW.jpg
C1045 190628 1115am, STS, Moretrench drilling runoff through grout plant area, La Cienega shaft, looking W.jpg
C1045 190628 1116am, STS, Moretrench drilling runoff at SDW-8, La Cienega shaft, looking E.jpg
C1045 190628 1116am, STS, Moretrench drilling runoff, La Cienega shaft, looking S.jpg
C1045 190628 1117am, STS, Moretrench drilling runoff at SDW-8, La Cienega shaft, looking W.jpg
C1045 190628 1118am, STS, Moretrench installing Soil Nail, first row, second nail, W La Cienega Bulkhead, looking SW.jpg
C1045 190628 1123am, STS, Moretrench grouting Soil Nail, first row, second nail, W La Cienega Bulkhead, looking SW.jpg
C1045 190628 1133am, STS, Collector trenches without Moretrench drilling run-off, La Cienega shaft, looking N.jpg
C1045 190628 1134am, STS, SDW-8, La Cienega shaft, after Moretrench drilling run-off, La Cienega shaft, looking W.jpg
C1045 190628 1205pm, STS, Moretrench removing drill steel at Soil Nail, first row, second nail, W La Cienega Bulkhead, looking NW.jpg
C1045 190628 345pm La Cienega Station level D. Moretrench drilling soil nail #24 at west wall C piles 59-58. Looking West..jpg
C1045 190629 1059am, STS, High flow of waste water from Moretrench drilling operation, at SDW-8, La Cienega Shaft, Looking NW.jpg
C1045 190629 1101am, Moretrench grouting soil Nail, N Tunnel, 3rd row, 3rd nail, W La Cienega Bulkhead, Looking SW.jpg
C1045 190701 1108am, Moretrench drilling Soil Nail #11 (Row2, Nail6), West Bulkhead, La Cienega station, Looking SW.jpg
C1045 190701 1209pm, Moretrench, issues pulling drill casing (stripped threads) , Soil Nail 11 (R2N6), La Cienega N Tunnel, W end, Looking S.jpg
C1045 190702 1030am, Moretrench Drilling Soil Nail # 11, Row 2, Nail 6, West Bulkhead, N Tunnel, Looking NW.jpg
C1045 190702 1049am, Moretrench testing soil Nails, S Tunnel, Setting up on Row 3, Nail 6, West bulkhead, looking NW.jpg
C1045 190702 1051am, Moretrench Grouting Soil Nail # 11, Row 2, Nail 6, West Bulkhead, N Tunnel, Looking SW.jpg
C1045 190702 1123 AM La Cienega Yard -STS- Offloading a delivery of cement for Moretrecnch. View SE.jpg
C1045 190708 1236PM La Cienega Station Moretrench testing W. wall N. tunnel 4th row Soil Nail #2. Looking SW.JPG
C1045 190708 325pm La Cienega Station, La Cienega Shaft. Moretrench not onsite during shift. Looking South..jpg
C1045 190709 1110am, Moretrench performed maintenance on drill rig at La Cienega, looking S.jpg
C1045 190909 1050am, STS tied up loose rebar at bottom of La Cienega shaft, looking NE.jpg
Thumbs.db
C1045 190520 900am, Moretrench assembling Soil Nails, La Cienega Shaft, Looking W.jpg
C1045 190521 1046am, STS Survey Laying out soil nails prior to shotcrete, W end Wall, Level D, S of La Cienega Shaft, Looking SW.jpg
C1045 190521 1210pm, STS, Installing Sleeves for Soil Nails prior to Shotcrete, La Cienega Level D, W wall, Piles P-157 to -160, Looking NW.jpg
C1045 190523 1133am, Moretrench Reconfiguring STS Excavator to drill Soil Nails, Level D E of La Cienega Shaft, Looking SW.jpg
C1045 190524 1134am, STS Excavator reconfiigured for Moretrench to drill soil nails, Level D, E of La Cienega shaft, Looking SE.jpg
C1045 190529 1050am, Moretrench contour graded and installed crane mats at La Cienega shaft, looking NE.jpg
C1045 190601 950am, Moretrench delivered drill rods to bottom of La Cienega shaft, looking N.jpg
C1045 190611 357pm La Cienega Station Level D. Moretrench jacking test nail #2 row 4. At shoring pile 158-159 west wall C. Looking W.jpg
C1045 190613 1055am, STS surveying crew checked locations of La Cienega station west end soil nails, looking E.jpg
C1045 190613 1156am, STS, Cementitious-appearing residue & evidence of high flows W of DSW-16, S of La Cienega shaft, Looking W.jpg
C1045 190619 1145am, STS, Collector trench in gut trench ending at Pile P-126, W of Gale shaft, Looking W.jpg
C1045 190619 1148am, Moretrench , STS, Flooding from Drilling activities E to pile P-129, SE of La Cienega Shaft, Looking SE.jpg
C1045 190620 1103am, Moretrench for STS, Setting up to drill Test Soil Nail #1, W bulkhead, S of La Cienega shaft, Looking SW.jpg
C1045 190620 1116am, Moretrench for STS, Test Soil Nails Assembled & ready to install, La Cienga Shaft, looking N.jpg
C1045 190620 1159am, STS, SDW-8, Moretrench drilling Soil Nail, La Cienega Shaft, Looking NE.jpg
C1045 190702 345pm La Cienega Station level D. Moretrench drilling soil nail No.9 row 3. West wall C. Looking West..jpg
C1045 190703 1207pm, Moretrench drilling Soil Nail # 3m Row 1, Nail 3, N tunnel, W La Cienega bulkhead, looking NW.jpg
C1045 190703 1207pm, Moretrench testing soil nail #10, Row 2, nail 7, S Tunnel, West La Cienega Bulkhead, looking SW.jpg
C1045 190710 1116 AM La Cienega Yard -Moretrench- Offloads a delivery of bags of sand for their soil nails operation View SE.jpg